|
|
Dadsonics .: Resources .: Staging/Touring
|
Staging/Touring
Venue/Staging/Touring Logistics (as of 2002 Note: details
change from project to project. Please enquire re the present)
- Venue
A priority is good natural or enhanced acoustics. Floor and ceiling
surfaces
preferably wooden or tiled.
From Scratch occupies a central circular area of approx 6 metres
diameter.
Microphone enhancement preferable in most circumstances, plus
experienced
technician provided by organizers. - Staging:
Preferred staging is in full or 2/3 round at the same level (or
lower) as the audience. This is intrinsic to the performing style
of the group. Audience can be positioned in full, 3/4 or 2/3 round,
or along two sides. The group can adapt to proscenium if the only
option available. - Lighting:
The group uses simple dramatic overhead lighting, off grid or
on high-stand rigging. (details supplied on request). - Sound:
Amplification enhancement is desirable in most venues. Approx'
10 microphones are required. - Storage and assembly space is required. Rehearsal space is also
needed, ideally being the actual performance area. - The group prefers to be on location at least one day prior to
performance for setup and rehearsal, as instruments & lighting
can take up to 3-4 hours to assemble. If this is not possible
a minimum of 5 hours is required for assembly and set up prior
to performance.
Touring - current details supplied on request
|
|
From Scratch live
|
|